Skip to content
English
  • There are no suggestions because the search field is empty.

How do I run a report on all inspections performed in a date range?

In the Construction module, click Reports in the top toolbar, then Inspection Reports. From there:

Report

Use for

Inspection Log Report

All inspections in a date range, across all inspectors

Inspection Activity Report

Inspections tied to one specific permit number

Inspector Daily Log

Daily inspection stops per inspector for a date range; can be narrowed further by subcode