How do I run a report on all inspections performed in a date range?
In the Construction module, click Reports in the top toolbar, then Inspection Reports. From there:
|
Report |
Use for |
|---|---|
|
Inspection Log Report |
All inspections in a date range, across all inspectors |
|
Inspection Activity Report |
Inspections tied to one specific permit number |
|
Inspector Daily Log |
Daily inspection stops per inspector for a date range; can be narrowed further by subcode |